ABDE Solutions
Bio-energy for your future
Biomethanisation Brussels
ABDE is helping to advise on the technical specifications and elaboration of the construction of a biomethanization unit in the city of Brussels, with the aim of processing 25 to 30,000 tons of methanizable waste per year and producing heat and electricity through cogeneration and the production of biofuel.
About us
We are a dynamic engineering team focused on energy and with international experience. Our employees are experts in their field and master a broad experience on renewable energies.
More than 20 years of experience is realized in the field of renewable energy facilities. We are capable realizing complex projects from the design through building and in operation.
We are a team that has a project-focus on energy, always realizing the most optimal solution and capable of finding the best answer to your energy demands.
Francies Van Gijzeghem
Director ABDE Solutions
Services
ENERGY ANALYSIS
A good analysis is needed to arrive at a correct solution. This can range from a simple site visit with first-line advice to a detailed study in which the different options are evaluated.
COMBINED HEAT & POWER
Optimal energy conversion takes place via a local coupling of electricity generation and heat recovery, in short cogeneration.
BIOGAS
Fermenting biomass under anoxic conditions produces biogas. This biogas is rich in methane, at least 50%, making it a high-quality energy carrier.
BIOMASS
Biomass is simply everything that is green and grows on the earth. Biomass, however, has many aspects and can be solid, pasty or liquid, but is always capable of generating renewable energy.
GRIDCONNECTIONS & ENERGY DISTRIBUTION
In energy distribution, we make a distinction in the scale of the actual application of energy. This can be done on a large scale on the basis of central production, such as a power plant with distribution on the transmission network.
POWER 2 X – to CO2-neutral
Europe proposes a share of renewable energy for 32% in 2030 and climate neutrality by 2050. These are important and far-reaching objectives. To convert to climate neutrality requires a lot of planning and many years to complete, but requires re-thinking of all processes.
CONTACT
ABDE Solutions
Krimperslaan 4a
B-9140 Temse
telefoon: +32 (0) 473 813 183
telefax: 03 711 11 91
BTW nummer: BE0865.512.588
ABOUT US
SERVICES
CONTACT
NEWS